Finally my Escort Mk2 is now making progress. The shell has started being fa
bricated this week and is well on it's way. Hoping to order the Ve RWD conversion stuff soon once I get some payments in and then get the engine built. Will keep this updated as much as possible Pic heavy but here goes.
4 door shell bought in 2011 and stripped :
Underseal all stripped off :
Ready for sandblasting :
After sandblasting :
At the fab shop :
Front end top plated, gusseted and seam welded :
Rad cut out and seam welding :
Reart turret and seam welding :
4 link boxes, turrets and seam welding
Cheers,
Rob
bricated this week and is well on it's way. Hoping to order the Ve RWD conversion stuff soon once I get some payments in and then get the engine built. Will keep this updated as much as possible Pic heavy but here goes.
4 door shell bought in 2011 and stripped :
Underseal all stripped off :
Ready for sandblasting :
After sandblasting :
At the fab shop :
Front end top plated, gusseted and seam welded :
Rad cut out and seam welding :
Reart turret and seam welding :
4 link boxes, turrets and seam welding
Cheers,
Rob